We are headed back off the grid, on to the sea, and into full time freedom… I have wrapped up my final days with my employer. We (Tim, Alli and 5 year old Orion) plan on departing this summer on a blue water voyage of unknown destination. I now have a month before sandblasting to complete the interior, systems, rig and engine install. Being a follower of Adventure Builders principles this should be no problem. Life is Flying by!!!! Launch late june, or early July in Lake Ontario
Here is what the fine vessel looks like now. 3 Coats of West System epoxy inside and out of the 1 1/2″ Honduran Mahogany cabin sides. Each panel of the interior has been fitted, removed, painted 2-3 coats all sides and then installed. Alli Has much/most of the interior upholstery complete. Mahogany doors complete each of the lockers shown.
Time-Family